The Woodworking Shop (Studio 5 / Facilities Building) showing the side of the building which faces Shaklee in 2018, a clapboard faced "Crafts Building/B Building", and Clifton Street at the end of the dirt road..
The Woodworking Shop (Studio 5 / Facilities Building) with men at work leveling the ground in preparation for building Crafts/B Building, looking toward Clifton Street. Frederick Meyer at lower left.
View of the Woodworking Shop (Studio 5 / Facilities Building) soon after its completion, taken from where B Building stands in 2018, looking toward Clifton Street
View of the Woodworking Shop (Studio 5 / Facilities Building) during its construction, by Frederick Meyer and students, taken from where B Building stands in 2018, looking toward Clifton Street